Shore Street shore during alterations. 16 May 2008.
The pipe in the ground is the rising main from Ayre road pumping station taking the toon sewage to Weyland Bay and up to the Head of Work.The plastic pipe alongside is the communication duct laid in the same track. Added by Dave Marwick on 17 May 2008.
Added by Dave Marwick on 17 May 2008.